Nouveautés septembre 2017 – Mise à jour Mobilis 20170911

Since our last update in July, a lot as been going on at Mobilis Systems! Here’s the summary of what we are delivering in this Mobilis Update 20070911.
Illico:
– Component management
* fix – for refresh according to the last query after update
* – remove filter from last query when returning from update
– Optimization result
* Fix – Invisible item if all the use material come from another list
– Lost calculation with multiple dependency
Inca:
– Purchase order
*catalog update desactivited when creating a sequence from an existing po.
A message will open to the user at the creation
This will avoid any catalog update with old price from a po.
This option can be desactivited and activated by the user if a price change is requested.
– Purchasing request-
* Price analysis
> column added to show the Presto price if available.
[N] mark will be displayed if a buying note is entered in Presto..
.. This note will show in a caption bubble when the cursor is over the cell.
> New section available to show the last price obtain for a piece in the grid.
Show information about the last price paid.
This section is synchronized on item in the grid. move cell, new information.
– Search functionality
* fix – change status error “0-available” on an item that is split on more than one cut list. (prov or Prod list)
– Detailed inventory report
* New option to print or not the inventory prices.
– Reception sheet
* Fix – list loading depending on SQL Server version
– Purchasing request-
* Fix – Received Date save as “1899-12-31”
… When adding a new supplier in the grid
Profacto:
– Projet interface
* Fix – “Expedition” button in the invoicing tab don’t show any shipment from Illico.
Protrack:
– Production Gantt
* you can now add columns to the operation by assembly grid.
The option is accessible by the contextual menu (right click) on the operation grid.
Column available: number of items, structure element, attribute, finish
* The application will save your choice of column and size at the closing
* Fix – Operation date and hours with 12h format (AM-PM)
operation time was not visible in that case.
ent non visible dans ce cas.
– Production graph
* you can now add columns to the operation by assembly grid.
The option is accessible by the contextual menu (right click) on the operation grid.
Column available: number of items, structure element, attribute, finish
* The application will save your choice of column and size at the closing
* Fix – Operation date and hours with 12h format (AM-PM)
operation time was not visible in that case.
– General
* minor fix and enhancement
– Production – Real time monitoring
* Fix – Error from the current non-compliance grid with filter on an operator
The filter is applied on the operator that have declared the non-compliance
* Closing an “in-progress” operation
> New option to enter time in minutes instead of closing Hr-date
Closing hr-date will be calculated by adding the entered tim from the start hr-date
* Revise an operation
> New option to enter time in minutes instead of closing Hr-date
Closing hr-date will be calculated by adding the entered tim from the start hr-date
>Option “Keep start according to selection” when selecting multiple row to revise.
… available only on operations with start/end type.
if activated, all operation will keep their start time
… if the time is entered in minutes, ending hr-date will be calculated from the original date (start)
… if the end date is entered, the time in minute will be calculated with the difference between the start and end date.
– Production batch
* “List of assemblies” functionality showing the assemblies depending their active status.
Division > all assemblies from all production batch from the selected division
Batch # > all assemblies from a selected production batch
Division column replaced by the production batch #